Valve projects are not always certified to project documents. A certificate may cover only part of a product range but be presented for the entire series. Test Report could be just “Pass” and the test pressure, holding time, and test medium would not be recorded. Sometimes it is good as it should be, but the name plate, material certificate and certificate scope are not the same, and this leads to the failure of the project acceptance.
These problems are challenging to correct after they arise when bidding, customs clearance or at final delivery. The wise thing to do is to verify the relevant standards, scope of certification, testing requirements and documents to ship with the order before it gets to you. PLUMBERSTAR examines the various certifications, testing needs and compliance documents typically expected for various markets and service environments in this guide. We outline some of the frequent buying pitfalls to enable buyers to be aware of potential pitfalls before procurement starts.
1. Why Valve Standards Matter in Engineering Projects
In the case of international engineering projects, adherence to the required standards may be more significant than brand or price. A valve can be a good product but it may not meet the bidding, project acceptance or market entry criteria due to its design characteristics. One of the best ways to minimise project risk is to check through standards and certifications that may be applicable as part of the procurement process.
1) Different Industries Follow Different Standards
No one size fits all when it comes to valve certification. There are specific needs for each sector.
For instance potable water systems are generally NSF, WRAS or ACS certified. API standards are generally followed in the oil and gas projects. Pressure equipment is designed and tested to ASME or EN standards and fire protection equipment may also need UL or FM certification.
Always determine the application, target market and industry requirements before requesting certificates from a supplier. Then pick out which standards apply and not “every available certificate.
2) Having a Certificate Does Not Mean Every Valve Is Certified
Customers may think if a supplier is CE, API or NSF certified, then all of their products are covered. In fact, most certifications only cover certain products, sizes, materials and/or pressure classes. For instance, NSF certification of a DN15-DN50 Brass Ball Valve will not automatically apply to the DN100 DN and stainless steel Ball Valves.
Don’t just take their word for it when they tell you that a certificate exists when looking at the qualifications of suppliers. Ensure that the specific model of valve to be installed is within the scope of approval.
3) Valve Standards Affect Cost, Lead Time, and Market Access
More than access to market: Certification. It impacts also manufacturing expense and delivery time. Routine pressure testing (RS) of standard industrial valves may be required before they are shipped. Valves conforming to API standards or supplied with PED, NSF or other compliance requirements typically need extra material traceability, specialized testing, third party assessment and technical documentation. All of these increase both production cost and lead time.
With export projects it is much more cost-effective to get the required standards confirmed before production begins than to attempt to get it after the valves have been produced. Also it’s good to prevent delays in delivery and project acceptance.
2. Common Valve Certifications and International Standards
Various certifications and standards are used in various countries, industries, and applications. Some are needed for use in market access, others for valve design and production, and others for safety and performance of the materials used.
1) Common Certifications for Potable Water Systems (NSF, WRAS, ACS, cUPC)
The certifications are for valves and piping parts in municipal water supply, building plumbing, drinking water treatment, and water filtration. The primary evaluation areas for NSF, WRAS and ACS are lead content, material leaching and impact of wetted materials on drinking water quality. cUPC focuses more on the product build, pressure capability, installation size, and North American plumbing codes. A comparison is shown below.
| Certification | Region | Typical Applications | Key Test Requirements | Certificate Management |
| NSF/ANSI 61 + 372 | United States, Canada | Municipal water supply, building plumbing, water treatment equipment, and potable water valves | NSF/ANSI/CAN 61 evaluates the health effects of materials and products in contact with drinking water. NSF/ANSI/CAN 372 limits the weighted average lead content of wetted components to no more than 0.25%. | Certification is managed by individual product model or certified product family. |
| WRAS | United Kingdom | Residential and municipal drinking water systems | BS 6920 water quality testing, material declaration, and cold- or hot-water testing based on the product’s service temperature. Hot-water approvals are commonly issued for 65°C or 85°C. | WRAS and CE serve different purposes and are not interchangeable. The approval scope specifies the product series, model, size, material, and maximum service temperature. |
| ACS | France and some French-speaking regions | Municipal water supply, building plumbing, and drinking water treatment projects | Long-term immersion hygiene testing in accordance with French drinking water material requirements | Technical assessment and certification are issued by authorized laboratories in France. Certificates are valid for five years. |
| cUPC | North American plumbing installations | Residential, commercial, and plumbing systems in the United States and Canada | Mechanical strength, dimensional compatibility, pressure resistance, and sealing performance | Testing and certification are conducted by IAPMO R&T. Certificates specify the product model, applicable standard, and certification mark. |
ACS Certification
2) Common Design, Manufacturing, and Testing Standards for Industrial Valves (API, ASME, ASTM)
These standards are highly utilized for industrial valves in oil and gas, petrochemical and high-temperature and high-pressure power applications. The API-based system is used across the entire global oil and gas industry, and each standard has its own particular application.
a) API Standards (Performance, Fire Safety, and Testing)
API 598: This is the most popular American valve pressure and leakage testing standard; and
API 6D: Applies to ball valves, gate valves, plug valves, and check valves in oil and gas pipeline systems;
API 6FA / API 607: API 607 is for quarter-turn valves and valves with non-metallic seats and API 6FA is for fire type testing of valves. In the typical testing, the valve is subjected to flames of about 925° to 1095° C for 30 minutes and then tested for leakage both during the fire exposure phase and the cooling phase. Requirements are specific to the required edition of the standard and to the type of valve.
API Certification
b) ASME Standards (Dimensions, Flanges, and Pressure-Temperature Ratings)
ASME B16.34: Defines pressure-temperature ratings for flanged, threaded, and welded-end valves;
ASME B16.10: Specifies face-to-face and end-to-end dimensions for valves to ensure interchangeability during pipeline installation.
c) ASTM Standards (Valve Body and Trim Materials)
The valve bodies and trim parts are made to ASTM material standards, which include chemical compositions, heat-treatment and mechanical properties. A105 is carbon steel forgings, A216 WCB is carbon steel castings, A182 F304/F316 is stainless steel forgings, A351 CF8/CF8M is stainless steel castings, and A182 F51/F53 is duplex stainless steel forgings.
d) NACE MR0175 / ISO 15156
In the case of carbon steel or some low alloy steel parts, 22 HRC is a common maximum suggested hardness limit by NACE MR0175 / ISO 15156. The service temperature, partial pressure of H₂S, and the operating environment should be considered when assessing stainless steels, duplex stainless steels, and nickel alloys.
3) Valve Compliance Requirements for the European Market (CE and PED)
For valves sold into the European Union, CE marking is based primarily on the Pressure Equipment Directive (PED) 2014/68/EU. In general, PED applies to fixed pressure equipment and pressure accessories with a maximum allowable pressure (PS) above 0.5 bar. Some products fall outside the scope of the Directive or are classified under SEP (Sound Engineering Practice).
CE Certificate
a) PED Risk Classification
PED classification is based on fluid classification, maximum allowable pressure (PS), nominal diameter (DN) and equipment category. Usually products are rated in one of the following five categories; SEP, Category I, II, III, or IV. Hazardous media, increased pressure and increased valve size typically lead to increased category and the conformity assessment by a Notified Body.
b) Supporting Harmonized Test Standards
Pressure and seat leakage testing is carried out in accordance with EN 12266 and ISO 5208. Chemical plants and VOC control projects in Europe often require additional fugitive emission testing to ISO 15848.
c) Mandatory Compliance Documents
These are typically the documents required for compliance: the EU Declaration of Conformity, Pressure Test Record, Material Traceability Record, PED classification Record, and Technical Documentation. In addition, the applicable Notified Body certificate and/or assessment documents as required by the chosen conformity assessment module must be provided for Category II, III and IV products. Documents that are lost, or do not comply with the product supplied, may lead to a delay in customs clearance, regulatory action, rejection of the project, or product recall.
4) Certifications for Actuated Valves and Special Service Conditions (UL, FM, ATEX)
These certifications are typical for motorized valves, hazardous areas and fire protection systems.
a) ATEX (Explosion Protection – European Union): ATEX applies to electrical equipment used in hazardous areas within the European Union. Electric actuators should be ATEX certified for the particular gas/dust explosion group and valves are frequently ATEX certified for use in hazardous areas.
b) UL / FM (North American Electrical Safety and Fire Protection): UL mainly has a focus on electrical safety and fire protection equipment and FM Approvals concentrates on fire protection and property loss prevention products. Valves that are UL Listed, FM Approved or both are often required on a North American level in fire protection projects.
c) Other Specialized Certifications: SIL for valves and actuators in Safety Instrumented Systems (SIS). ISO 29001 is the quality management standard that was created for the oil and gas industry. TSG provides regulatory supervision, type testing and licensing for special equipment and pressure piping parts in China.
3. Common Testing Requirements During Valve Manufacturing
The pressure, leakage, dimensional, and functional testing are generally included in factory inspection. Only if specified or required by the product standard or project specification will fire testing, cycle life testing and fugitive emission testing be conducted.
1) Pressure Testing: Verifying Body Strength and Sealing Performance
Typically, a pressure test consists of a shell test and a seat leakage test. Backseat testing is also required for valves designed with a backseat. Shell tests are generally performed in water or some low viscosity fluid. Gas testing is a higher risk task and is only acceptable if authorised by the product standard, design documents and/or an approved test procedure.
2) Shell Test: Verifying Pressure-Holding Capacity
a) Test pressure: The shell test pressure is typically 1.5 times the valve pressure rating at 38°C;
b) Minimum holding time (Typical minimum requirements under API 598)
DN ≤ 50: 15 s; 50 < DN ≤ 150: 60 s; 150 < DN ≤ 350: 120 s; DN ≥ 350: 300 s;
c) Acceptance criteria: Valve body, bonnet and flanges should exhibit no leakage, permanent deformation or cracking. The holding pressure shall not be less than the pressure specified by the applicable standard during the holding period. Some manufacturers also limit pressure fluctuation to within ±5% of the specified test pressure.
3) Seat Leakage Test: Checking Leakage with the Valve Fully Closed
a) High-pressure seat test: The test pressure is typically 1.1 times the valve pressure rating at 38°C;
b) Low pressure air leakage test: It is usually conducted under the condition of air or inert gas with the pressure of 0.4-0.7 MPa. Many factories apply 0.6MPa, but the pressure should be according to the applicable product standard API598, or project specification;
c) Leakage classes (ISO 5208)
Class A: No visible leakage is permitted during the specified test period. This class is commonly used for soft-seated valves;
Class D: Commonly applied to certain metal-seated valves. The allowable leakage rate increases with DN. Acceptance limits shall be determined according to the tables in ISO 5208 and converted where required for the selected test medium.
Valve Pressure Testing
4) Material Inspection: Verifying Material Composition and Properties
a) Spectrographic analysis (or Positive Material Identification (PMI)): If the valve body, stem, ball, seat or other critical components are deemed to require spectrographic analysis, they may be analyzed to confirm that the material composition is correct, both for the specified ASTM material grade and the corresponding Material Test Certificate (MTC);
b) Non-Destructive Examination (NDE): UT and RT detect internal defects. MT is used on ferromagnetic materials to identify surface and near-surface flaws, while PT reveals surface-breaking defects on stainless steel and other non-ferromagnetic materials;
c) Material testing for special service conditions:
In the case of H₂S sour service: Check hardness, chemical composition, and meet the NACE requirements;
In marine or high salinity environments: More salt spray testing, coating thickness measurement and coating adhesion testing may be necessary. Pitting corrosion, crevice corrosion and galvanic corrosion should also be considered in areas exposed directly to seawater;
For potable water systems: Conduct lead content testing, material leaching testing and testing for impacts on drinking water per NSF, WRAS, ACS or other applicable requirements.
Raw Material Inspection
5) Dimensional Inspection: Ensuring Installation Compatibility
Verify face-to-face dimensions in accordance with ASME B16.10 or GB/T 12224. Check flange dimensions against ASME B16.5 or GB/T 9113. Critical dimensions—including thread depth, flange bolt-hole spacing, face-to-face length, and actuator mounting interfaces—should be fully inspected or sampled according to the inspection plan to prevent installation problems in the field.
Dimensional Inspection
6) Functional Testing: Verifying Valve Operation
To ensure smooth valve operation, manual valves should be cycled with full open and closed movement. Electric and pneumatic valves should be tested for full operating cycle, limit switches and feedback signals should be tested for correct response. Dedicated reverse pressure closure test required for check valves.
7) Thread Torque Testing and Cycle Life Testing
The purpose of thread torque test is to ensure that the specified torque of the thread installation is not exceeded, avoiding the stripping of the threads, cracking, and permanent deformation of the thread. Installation torque testing can be performed on threaded valves to ensure the body and the threaded connection are intact. Also check the torque on the flange bolt, the operating torque of the stem, and the torque of the actuator output.
Cycle life testing evaluates long-term reliability by repeatedly opening and closing the valve. Typical project requirements specify 5,000, 50,000, or 100,000 operating cycles. Manual valves used infrequently are often tested for several thousand cycles. Butterfly valves used in water treatment or automated control systems may require 50,000 cycles, while high-frequency or high-reliability metal-seated ball valves may be specified for 100,000 cycles. Once the test is complete, operating torque and seat leakage should be checked again.
Thread Torque Test
4. What Compliance Documents Should You Request from a Valve Supplier?
When assessing a supplier, many buyers will only require a CE, API or ISO 9001 certificate. However, this is not sufficient for engineering projects. EPC contractors, governmental projects, and industries like oil and gas or chemical processing companies are more keen on seeing if a supplier can offer full and traceable technical documentation. Before ordering, check with the supplier that they are capable of supplying the following documents.
1) Certification Documents
Certification documents demonstrate that a valve complies with the regulations or industry requirements of a specific country, region, or application. Typical examples include NSF, WRAS, ACS, cUPC, CE/PED, API Monogram licenses, and API fire type test reports.
When reviewing certification documents, pay particular attention to the following:
- Whether the certification body is recognized and credible;
- Whether the certificate is still valid;
- Whether the type of valve purchased is within the scope of the approved certification;
- Whether the size, specification and material corresponds to the ordered product.
If you are working on a critical project, check the certificate on the official website of the certification body rather than the official PDF obtained from the manufacturer.
2) Material Certificates
A Material Test Certificate (MTC) lists the materials used for the valve body, stem, and ball, etc. One of the most important documents in industrial valve procurement, it is used by engineers to ensure that the materials they are buying are suitable for the project’s specifications. There are three main types of certificates that are commonly requested as set out in EN 10204:
- EN 10204 2.2 Test Report: The manufacturer declares that the product complies with the purchase requirements and provides results from non-specific inspections;
- EN 10204 3.1 Inspection Certificate: An authorized inspection representative, independent of production, issues the certificate and records the actual inspection results for the material batch;
- EN 10204 3.2 Inspection Certificate: The manufacturer’s authorized inspection representative signs the certificate together with the purchaser’s representative or an appointed third-party inspector.
For most international engineering projects, buyers normally request an EN 10204 3.1 certificate. It is widely specified for oil & gas, power generation, and chemical applications.
3) Testing Reports
Testing reports demonstrate that the valve has been tested in accordance with the applicable standard. Typical reports include:
- Shell pressure test;
- Seat leakage test;
- Air leakage test;
- Torque test;
- Functional test;
- PMI report, where required by the project.
The report of the test should include the following information: test standard, test pressure, holding time, test results, and inspector information. A simple “Pass” statement will not suffice. The valves are often checked to API 598 standards, and possibly EN 12266 and/or ISO 5208 for European projects.
4) Inspection Reports
Inspection reports document quality control throughout the manufacturing process and typically include:
- Visual inspection;
- Dimensional inspection;
- Material verification;
- Assembly inspection;
- Final factory inspection.
For large engineering projects, an Inspection and Test Plan (ITP) can also be used, detailing the inspection activities, acceptance criteria and third party witness points throughout the production process.
5. Common Mistakes When Purchasing Certified Valves
Based on issues frequently encountered during valve bidding, supplier qualification, and project acceptance, PLUMBERSTAR has summarized the following mistakes buyers should avoid.
Mistake 1: Confusing Quality Management Certification with Product-Specific Certification
Project issue: Many buyers check only the supplier’s ISO 9001 quality management certificate and assume it also proves product compliance. As a result, they overlook product-specific documents such as API fire type test reports, PED conformity documents, TSG licenses, and type test reports;
Risks: ISO 9001 is for the certification of the manufacturer’s quality management system. It does not show that a particular valve has been tested in terms of pressure, leak, fire or sour service testing. Some traders/manufacturers may be able to get ISO 9001 certificate at a lower price but do not have the facilities to perform API fire testing or PED 3rd party conformity assessment. The certificate by itself cannot prove that the valve is in line with the requirements of the project;
Solution: Supplier Qualification on Three Levels: ① Factory qualification (ISO 9001, ISO 29001); ② Product performance (service specific type test reports API 6FA, PED and TSG); ③ Documents provided along with each valve: PMI report, NDE report, original pressure test report. All three are mandatory and the certificate should match the DN, pressure class and material specified on the valve nameplate.
Mistake 2: Assuming One Certificate Covers Every Product While Ignoring PED Classification and API Scope
Project issue: Buyers get a PED CE certification or an API 6D report and think that the certificate applies to all valve sizes, pressure classes, and applications. The same certificate is then used for large, high-pressure valves working under hazardous or toxic conditions;
Risk: Classifies products as SEP or Categories I-IV, depending on the type of equipment, fluid group, fluid state, maximum allowable pressure (PS), nominal diameter (DN), or vessel volume (V). A CE certificate on a valve rated for Category 1 water service won’t qualify a valve for Category III or IV service for flammable or toxic media. API 6D Monogram also specifies the approved valve type, size range, pressure class, material, and the edition of the API 6D standard to which the valves are conforming. Products outside that scope are not covered. A common problem is that suppliers provide certificates for small, low-pressure valves while the actual order is for larger valves with higher pressure ratings;
Solution: Check the certification scope as soon as the documents are received. Confirm that the approved DN range, pressure class, fluid group, and risk category match the project requirements. For Category II, III, and IV products, also verify the Notified Body number, conformity assessment module, and supporting certificates.
Mistake 3: Looking Only at the “Pass” Result Without Reviewing the Test Conditions
Project issue: Buyers and inspectors review a pressure test report, see the word “Pass,” and move on. The test pressure, holding time, test medium, and valve specification are never checked;
Risk: Typical problems include insufficient shell test pressure, shortened holding time, or gas being used instead of liquid for shell testing without approval. Under API 598, shell testing is generally carried out at approximately 1.5 times the pressure rating, and large valves may require a minimum holding time of 300 seconds. Without verifying these details, the final result alone has little value;
Solution: Make a standard checklist for test reports. At the very least, check for test pressure, time, test media, and valve size or pressure class. If you are not sure, or are using it at high pressure and high risk applications, you may consider sending random samples to an independent lab for validation.
Mistake 4: Ignoring the Consistency Between the Valve Nameplate and Certification Documents
Project issue: Suppliers sometimes provide a complete set of certificates and test reports, but the valve nameplate tells a different story. The pressure rating, material, or nominal diameter on the valve does not match the supporting documents. In some cases, one certificate is even used across an entire product range.
Risk: Inspectors start with the valve itself during this stage of customs clearance. The information on the nameplate may not match the information on the certificate which will cause them to refuse the valve and may even lead to the rejection of the entire shipment.
Solution: Before accepting the shipment, compare the valve nameplate with every supporting document. Verify the CWP, DN, body material, and manufacturing standard one by one, and make sure they all fall within the certified scope and match the corresponding type test reports. Save clear photographs of the nameplate together with the certification documents for future reference.
Mistake 5: Using General Standards for Special Service Conditions
Project issue: Buyer uses only general pressure testing standards (GB/T 13927) without verifying if this is applied to oil/gas, fire-safe service, sour service, hazardous service, fugitive emissions and/or high-temperature power application. For instance, API 6FA or API 607 fire testing might not be verified and project-specific fugitive emission requirements like ISO 15848, API 624, API 641 or Germany’s TA Luft might not be considered;
Risk: Any extra testing and/or certification required by the tender documents or customer specifications that are not provided may result in the tender not being accepted, failure of acceptance testing, or repetition of the test itself. A fire-safe valve will not meet its specifications without API 6FA or 607 test certificates. Likewise, valves used in hazardous VOC service in Europe may fail customs clearance or project acceptance if fugitive emission certification is missing;
Solution: Match the required standards to the service conditions before placing the order. Start with the service medium, project location, applicable regulations, product standards, and any additional tests specified by the customer. Oil and gas pipeline projects commonly require API 6D together with API 6FA, NACE, or other standards depending on the operating conditions. European chemical projects generally require PED and may also specify ISO 15848. Projects involving special equipment in China should comply with the applicable TSG requirements.
6. Conclusion
Evaluate valve specifications at the quoting stage rather than waiting for production or shipment, to gather necessary documents for your project. Create a list of items regarding the target market, service medium, pressure class, sizes range, relevant standard, required testing, and shipping documents. Check the list against the supplier before issuing your purchase order.
Include in PO or technical specification of large projects the list of certified items, material traceability requirement, witness points for inspection, and schedule of document submission. It will decrease the chances of any mistake related to certification and document preparation and eliminate potential delays at a late stage of a project.
Create a valve RFQ or technical specification and need some professional help? Send PLUMBERSTAR a valve type, nominal size, pressure class, service medium, and target market. We will help you to determine necessary standards, testing, and documentation, and offer valves according to your needs.