| | Bathroom Round Brass Angle Valve The interior of the Bathroom Round Brass Angle Valve features a ceramic valve core. It has a smooth switch operation and excellent sealing performance. Its compact size saves space. It is suitable for water pipe connections of various bathroom fixtures such as bathroom basins, shower heads, and bathtubs. It can precisely control the on-off of water flow at each water usage point. Additionally, it can quickly shut off the water supply during equipment maintenance or accessory replacement.
|
| | Multi-rotor Water Supply Stop Valve The Multi-rotor Water Supply Stop Valve has a built-in multi-rotor regulating valve core. It can achieve multi-level precise regulation and smooth shut-off of water flow. Its valve stem adopts an anti-seize design. The opening and closing operations are light and not easy to get stuck. It can adapt to the complex working conditions of water supply systems. This product is widely used in municipal water supply, secondary water supply for high-rise buildings, and industrial circulating water systems.
|
| | Five-way Washing Machine Angle Valve The five water outlet ports of the Five-way Washing Machine Angle Valve can simultaneously connect multiple kitchen and bathroom water-using devices, such as washing machines, water purifiers, and dishwashers. There is no need to install additional water separators. It saves installation space and is compatible with hose connections of various specifications. Each port can independently turn on/off. It is convenient to repair a single device separately without affecting the water usage of other devices.
|
| | Square Angle Stop Valve The Square Angle Stop Valve is suitable for various modern kitchen and bathroom decoration styles. The interior features a ceramic valve core. With a compact size, it can flexibly connect the wall water pipes to various kitchen and bathroom water-using equipment. It can precisely control the on-off of the water circuit and quickly shut off the water supply during equipment maintenance or accessory replacement.
|
| | Heavy-duty Drum Faucet The sealing structure of the Heavy-duty drum faucet is tight. The switch valve core is wear-resistant and durable, enabling rapid conduction and cut-off of media. It is applicable to chemical raw material barrels, industrial waste liquid barrels, edible oil barrels, etc. It meets the discharge requirements of large-capacity liquid storage containers. It can effectively prevent liquid leakage.
|
| | Garden Water Tap Lever Type Valve The surface of the Garden Water Tap Lever Type Valve undergoes anti-rust treatment, featuring weather resistance and being less easily deformed. Its lever-type switch design makes operation labor-saving and convenient. A light flip can achieve quick on-off and rough adjustment of water flow. It is equipped with a universal threaded interface. It is compatible with gardening accessories such as garden hoses and sprinklers. It is not prone to water leakage. It is a practical tool that enhances the convenience of gardening water usage.
|
Base For Assembling A Straight Pump Group
The hole design of the Base For Assembling A Straight Pump Group can match the dimensions of in-line water pumps, valves, and pipe fittings. It enables quick assembly and positioning of the pump group. The base also has its own shock pad. It can reduce vibration and noise when the pump unit is running. The bottom is also reserved for drainage and installation slots. Easy to fix and maintain pump sets on site.
- Model No.: JX-10031
- Material: Stainless steel 304/Iron
- Specifications: 1″
- Spacing: 125 mm
- Pump connection: 180 mm
- Thermometer connections: 1/2″
- Circuit power: 25 KW
- Applicable Medium: Cold and hot water
- Type: Hydraulic balance/Hydraulic distribution
- Nominal pressure: 6bar
- Working temperature: -10℃-110℃
- Support Free Technical Report
- Finishing with customization.
- OEM/ODM
- Free sample
1. What’s the main advantage of using a “straight” pump group configuration?
2. Are there different surface treatment options for the Pump Station Tube?
3. Can a free inspection report for the Pump Station Tube be provided for each order?
Absolutely yes. Every single order of our pump station tubes comes with a free inspection report from Plumberstar, no extra fees needed. This report covers five key check items with clear real test numbers for you to check easily. All test data is recorded one by one based on your exact order demands.
We check raw material, dimensions, and surface coating first. We use spectrum testing to prove that all tubes are genuine 304 stainless steel. Our workers measure outer diameter, wall thickness, and full length of every tube. All measured values keep within the ±0.1mm tolerance limit. We also write down coating thickness and adhesion test data matching your chosen surface treatment.
4. Can we apply for free Pump Station Tube samples to conduct our own quality assessment?
5. What is the lead time for bulk orders of custom pump bases?
For bulk orders of customized pump unit bases, the delivery time depends on the specific circumstances of the order:
- For bulk production orders with samples, the delivery time is usually around 30 days. This time frame has also been confirmed by feedback from our customers, who mentioned an average delivery cycle of 4 weeks.
- If your customized order requires us to develop new molds, the time to develop new molds is about one week. Then the total delivery time (including the manufacturing of new molds and the production of bulk orders) is approximately 40 days.
- For brand-new design projects: For customized design projects that start completely from scratch, the time for us to communicate with customers and produce design plans is within five working days. Therefore, the delivery time will be between 45 and 60 days.
Our order process is systematic to ensure efficiency. After confirming project details, including the schedule, quality control measures, and quantity, and accepting our quotation, we will start purchasing materials and put them into production. The entire production process from casting to packaging will be completed within 25 days. We even have a record of completing customized orders for customers within 28 days.
6. How to manage potential transportation delays to ensure on-time delivery of the Pump Station Tube?

